A second level mezzanine was recently added to this multi-level pick module to handle additional volume of full case and each picks. Take a look at the before photo (right) and after photos (below). The deck’s framework was completed during the initial installation in order to fast-track the 2nd phase as demand escalated and to avoid interrupting operations. The pick module integrates carton flow racking for cases and totes with metal shelving for slower moving SKUs.
See more photos in our Pick Module Gallery.